HOME | SITE MAP | CONTACT  
     
 
 
     
     
   


Project Name :   NINAKABBO
       
Location :   227 /A , Gulshan Tejgoan Link Road.
       
Developer :   Nina Holdings Ltd.
       
Total Land Area :   1.5 Bighas / 21,600 sft.
       
Total Built Area :   2,46,422 sft.(Approx.).
       
Total Levels :   13 storied commercial building with a mezzanine floor.
       
Each Floor Area :   15770 sft. (Approx.)
       
Mezzanine Floor Area :   8180 sft. (Approx.)
       
Parking :   5 Split level car parking for 106 cars with guest parking.
       
Completion Date :   December 2011
       
Rajuk Approval Number :   RAJUK/NOO-2/TAMA-5304/06/1624 Date-22/05/2007
       
   

IMPORTANT FEATURES

  • 100% back-up of electrical power by diesel generator
  • The backbone of the electric supply is distributed by BBT
  • Own Deep Tube Well in addition to WASA
  • Pressurized water distribution system will be used to get sufficient pressure
  • Central Air-conditioning system (1125 TR) with proper ventilation.
  • Automatic heat and smoke detection system
  • Instant action fire fighting system with auto water sprinkler in whole building
  • 2 nos. fire exit stair with pressurized duct for fire safety
  • Grand reception with concierge desk for office entrance
  • Minimal waiting at lift lobby by 4 nos. x 17 persons high speed elevators
  • The sanitary fixtures and fittings will be modern world class type
  • Contemporary exterior with concrete & tempered glass engraved of Bengali poetry.
  • Well design central core with full height atrium connecting sky light.
  • Maximum use of day light in interior space by clear glass.
  • Sufficient network outlets/Data cables shall be provided at each office suit
  • 5 Split level car parking for 106 cars with parking management system
  • Mechanical exhaust and ventilation system in car parking
  • The entire security system shall be monitored by CCTV from a central control room
  • The building is wholly planned by world class control and designated by BMS

SPECIFICATIONS

Foundation and Structure
Structural design has been done with synthesis of Bangladesh National Building Code (BNBC), American Concrete Institute (ACI) and American Standards for Testing Materials (ASTM).
The design has been done on the basis of Dhaka earthquake zone (BNBC) to prevent earthquake damages.
BSRM Xtreme 500W reinforcing steel, SCAN cement and only selected batched stone chips has been used in each concreting including fair face to retain similarity in color.

External Façade
Contemporary exterior only with concrete, clear glass from PILKIGTON and engraved lines of Bengali poetry.
Inspiration of contemporary open office system.
Well designed central core with full height atrium- connecting circulation lounges with a sky light on the top.
Visibility from the central lobby to feel togetherness with security barrier.
Media wall on ground floor with touch screen display, Dedicated to 12 eminent Bengali poets.
Maximum use of day light in interior space for comfortable work environment and saving power energy.
Low emission glass for exterior glazing for efficient air conditioning and saving power energy.
Water wall at the entry and water features with green gardens around the building.
Exterior night lighting.

Reception ,Elevator Lobby and Stair

Floor finishing of the lobbies for reception, welcome and lift will be done with base colored top class Italian marble.
Ceiling of the lobbies for reception , welcome and lift will be decorated with specially crafted boards with metal frames.
Interior decoration & furnishing will be done, matching the concept of whole building featuring Bengali poems & language.
Specially designed lighting will illuminate all lobbies.

Finishing of stair steps & lobby will be completed by best quality homogeneous tiles with matching color.

Toilets

Specially imported tiles for toilets floor & wall.
All Toilet fixture and fittings including water closet, urinal, basin, and faucets will be of top Japanese brand "TOTO" or equivalent.
Toilet zone main door will be of pure teak wood and internal doors will be of laminated waterproof boards.
False ceiling will be done by specially designed imported hunter Douglas materials.
Special place allocated for ablution on each floor.
All counter top will be marble finished.
Specially designed lighting will illuminate all toilets.

Air Conditioning and Ventilation

The building shall be completed with Central Air-conditioning system with proper ventilation from the world famous brand Carrier.
Temperature control and modulation of capacity shall be automatic and connected with building management system (BMS).
Forced ventilation system to ensure proper oxygen in basement. Our total cooling capacity is 1125 TR.

Elevators

Minimal waiting at Elevator Lounge by 4 nos. high speed elevators and 17 persons per lift, an exclusive and modern elevator from the world famous brand MITSUBISHI.

Electricity Supply and Distribution System

11 KV HT sub-station consisting of renowned brand cast resin transformer (dry type transformer) with AVR in HT line. Electrical distribution shall be with Bus-bar trunking system. All sensitive areas shall be used by fire resistant cable.

Electrical system shall be provided considering code of BNBC and shall be with modern distribution system.
Dual tariff energy metering system with centrally monitored and auto billing system.
Above false ceiling shall be used for air conditioning, auto water sprinkler and electrical distribution work which flexible to make the office at own design.

100% 0r Full load backup electricity for Power Supply in the total building by 1500 kVA x 2 nos. World class F.G WILSON diesel generator and also addition 200 kVA diesel generator for emergency power.

Water Supply System

The building will have its own deep tube well. Pressurized water distribution system will be used to get sufficient pressure in each outlet. WASA connection will be secondary.

Fire Detection and Fire Fighting System

  • Instant Action and State-of-the-art fire fighting with auto water sprinkler in whole building as a maximum safety and shall be with
  • Auto detection
  • Auto alarm
  • Auto starting pump
  • Fire brigade connection
  • Central station monitoring & indication by graphic display
  • Emergency signage
  • Fire announcement system and Self contained extinguishers system.
  • All the product to be taken UL listed and FM approved.
  • 2 nos. fire exit stair with pressurized duct for fire safety.

Security System

The entire security system shall be fool proof based on both electronic and manual systems operated and monitored from a central control room.
A team of about 40 security personnel headed by senior retired army or equivalent officials through a network of 38 closed-circuit television (CCTV) cameras.

Telephone & Data Cable

Sufficient telephone outlets shall be provided with other Data cables.

Building Management System

The building is wholly planned by world class control and designated as a world class intelligent building and maximize energy utilization and monitoring.

Car Parking Management

5 split level car parking altogether 106 vehicles can be parked at a time with guest parking facility.
A 50 feet wide connected roadway, branch to Tejgaon-Gulshan link road for Smooth traffic movement.
Functions

  • Office Spaces
  • Bank
  • Corporate Café